TGPS was contracted for testing the performance of the added equipment for the conversion of the simple cycle to combined cycle. The parameter of interest is the steam power output measured in the high side voltage of the step-up transformer corrected to the reference conditions specified in the combined cycle conversion contract.

Scope
  • Prepared a performance test procedure
  • Provided and installed High-Precision Instrumentation
  • Directed all testing activities onsite
  • Prepared a performance test report
  • Identified together with the client opportunities for improvement
  • Conduct a near field and far field acoustic test to ensure that the sound levels at the plant are in compliance with the acoustic guarantees
  • ASME PTC 46, ASME PTC 22, ASME PTC 6.2, ASME PTC-36
Project Overview
Plant Name

PP10

Country

Saudi Arabia

Technology

Combined Cycle

Total Power

3,200 MW